| |
| |
Divisions & Functions
| |
|
 |
| Studies
Department |
Whereby the project's documents of drawings, specifications and BOQs are entirely surveyed to ensure
the finest presentation of offers, technically and commercially.
|
|
| |
|
 |
| Design
Department |
Whereby the first and essential step of sound and intact job is taken,
utilizing the latest standards of engineering programs; the buildings' structures' and
their different uses are well studied, and the system's necessary design and shop drawings are prepared and correlated.
|
|
| |
|
 |
| Projects
Department |
Run by a team of highly qualified engineers and technicians specialized in electromechanical installations and control systems, whose mission is
to pursue and oversee all the processes of installation, commissioning and balancing, applying the latest measuring instruments.
|
|
| |
|
 |
| Maintenance
Department |
It is concerned with periodical inspections, guided by a technical well-studied program, to ensure a trouble-free performance for A/C systems. It is also concerned with cleaning and sterilizing air ducts, in addition to applying Heresite paint in treatment of condensing coils as a protective cover against rust and corrosion.
|
|
|
|
|
|

|